File #: 24-2502   
Type: PRWC Agenda Item Status: Closed
File created: 12/26/2024 In control: Polk Regional Water Cooperative
On agenda: 1/15/2025 Final action:
Title: Revision of Final Points of Connection for the Southeast Wellfield Project (Action)
Attachments: 1. H.4 PRWC_Pointofconnections_update Exhibit
Date Action ByActionResultAction DetailsAgenda DetailsVideo
No records to display.

SUBJECT

title

Revision of Final Points of Connection for the Southeast Wellfield Project (Action)

body

 

DESCRIPTION

Section 12.1 of the July 21, 2022 Second Amended and Restated Implementation Agreement requires that the Points of Connection (POC’s) and the location of meters used for the delivery of Project Water to the Project Participants be identified by the Cooperative no later than January 1, 2023.  The Cooperative, through consultation with the PRWC Technical Advisory Committee (TAC) and meetings with individual members, had identified POC’s for the Southeast Wellfield Project Participants which were approved during the January 2023 Board meeting.  The determination of the POC’s considered a number of factors, including transmission system routing, location of existing/proposed member facilities, hydraulic capacity of member systems, and future service area growth for each member. 

Since that time, updates to points of connection have been made.  This agenda item presents the updated POC Map which includes the following changes:

•                     Relocation of Polk County’s NERUSA point of connection

•                     Omission of Lake Wales’s point of connection (as they are not a Phase 1 project participant)

•                     Relocation of Auburndale’s point of connection

 

RECOMMENDATION

Approve updated Points of Connection for the Southeast Transmission Project. 

 

FISCAL IMPACT

No fiscal impact.

 

CONTACT INFORMATION

Mary Thomas

Mark Addison