Legislation Details

File #: 26-1969   
Type: County Manager Status: Agenda Ready
File created: 9/30/2026 In control: Board of County Commissioners
On agenda: 10/20/2026 Final action:
Title: Approve Amendment No. 3 to Consultant Services Authorization (CSA) No. 22-088-01 with HNTB Corporation, (Consultant) to provide engineering services for the Cypress Parkway at Lake Marion Creek Road Intersection Improvements Project ($1,047,865.46 one-time expense).
Attachments: 1. CSA 22-088-01 Amendment #3_Agenda Packet
Date Action ByActionResultAction DetailsAgenda DetailsVideo
No records to display.
SUBJECT
title
Approve Amendment No. 3 to Consultant Services Authorization (CSA) No. 22-088-01 with HNTB Corporation, (Consultant) to provide engineering services for the Cypress Parkway at Lake Marion Creek Road Intersection Improvements Project ($1,047,865.46 one-time expense).
body

DESCRIPTION
On March 21, 2023, the Board approved CSA No. 22-088-01 with the Consultant to provide professional engineering services to perform an alternatives analysis for improvements to the existing Cypress Parkway at Lake Marion Creek Road intersection at a cost not-to-exceed $102,255.00. The work effort included the evaluation of a single lane roundabout and a traditional mast arm signal. The draft alternatives analysis evaluation report was completed on August 3, 2023. Due to potential for widening of Cypress Parkway and Johnson Avenue in the future, it was recommended that the intersection be evaluated and designed for an ultimate 4-lane configuration, based upon the anticipated 4-lane expansion of Cypress Parkway within the study limits.

On December 5, 2023, the Board approved Amendment #1 at a cost not-to-exceed $54,255.00 to allow the consultant to utilize the results of the traffic analysis to develop one (1) conceptual intersection alternative for a 4-laned signalized intersection design and one (1) conceptual intersection alternative for a 2-lane roundabout design, bringing the total not-to-exceed fee to $156,510.00. During the developing of the draft conceptual intersection alternatives design for the ultimate 4-lane configuration, site constraints and design limitations were encountered including horizontal alignment and sight distance restrictions, access impacts to the Marion Creek Estates Subdivision, Argos concrete plant, and Duke power station, and right-of-way impacts to SFWMD property and private properties west of Baker Dairy Road. To avoid the site constraints and design limitations mentioned above, and to limit right-of-way impacts to one property, it was...