SUBJECT
title
Approve Change Order No. 001 (Deductive) to Guaranteed Maximum Price GMP-4 with Florida Water Partners for the Southeast Wellfield Transmission Main (Action)
body
DESCRIPTION
Guaranteed Maximum Price GMP-4 with Florida Water Partners was approved by the Project Board on May 21, 2025 in the amount of $28,639,140. GMP-4 consists of two Southeast Wellfield Transmission Main construction packages (Construction Package 2B and 4A - Exhibit "A") as well as an early-out bid package for transmission system valves.
Rule 12A-1.094, F.A.C., Public Works Contracts, "governs the taxability of transactions in which contractors manufacture or purchase supplies and materials for use in public works contracts, as that term is referred to in Section 212.08(6), F.S". Additionally, Article 14 of the Construction Manager-at-Risk ("CMAR") Agreement allows the Cooperative to exercise its right to purchase directly various construction materials, supplies and equipment that may be part of a Subcontract (a.k.a., "Cooperative Purchased Material").
A summary of owner direct purchase materials for GMP-4 is provided in Exhibit "B". As shown in Exhibit "B", the sales tax savings for GMP-4 is $486,027.20 based on a total pre-tax or bid amount of $8,041,949.88 for pipe and valves. Change Order No. 001 deducts the total material cost of $8,527,977.08 from GMP-4 to allow the Cooperative to direct-purchase these materials, resulting in a new Guaranteed Maximum Price of $20,111,162.92 (Exhibit "H"). In accordance with the CMAR Agreement, the Contractor (i.e., Florida Water Partners) remains responsible for shop drawings, placing ordering, taking delivery, installation/testing of materials, and warranties. Additionally, the Cooperative is not liable for interruption or delays, defects or other problems associated with Cooperative Purchased Material.
RECOMMENDATION
Approve Change Order No. 001 (Deductive) to Guaranteed Maximum Price GMP-4 with Florida Water Partners for ...
Click here for full text