AGENDA ITEM
title
Review/Approve Draft TPO Resolution 2025-03 Adopting Performance Targets for Pavement, Bridge, and System Performance for the Polk TPO
body
PRESENTER
Ryan Kordek, Polk TPO
SUMMARY
Under Federal regulations, MPOs must set four-year targets for the six bridge and pavement condition measures and four-year targets for three system performance measures. These are listed below as PM2 (Bridge and Pavement) and PM3 (System Performance.
Though an MPO has the option to establish its own system and infrastructure asset targets, the Polk TPO has agreed to support performance targets established by the Florida Department of Transportation (FDOT) for PM2 Pavement, Bridge and PM3 System Performance.
FDOT recently adjusted the 2025 targets for PM2: percentage of national highway system (NHS) bridges in poor condition; and PM3 percentage of person-miles traveled on the interstate and non-Interstate NHS that are considered reliable. As a result, there is a need for the Polk TPO to also adjust our targets. FDOT has also recommended the TPO to confirm its targets for the other PM2 and PM3 targets as well. The TPO’s TAC recommends approval of the Draft Resolution.
RECOMMENDED ACTION
Recommend the TPO Board approve Draft TPO Resolution 2025-03
ATTACHMENT
1. Draft TPO Resolution 2025-03