Skip to main content

File #: 25-0645   
Type: TPO Agenda Item Status: Agenda Ready
File created: 4/4/2025 In control: Transportation Planning Organization (TPO)
On agenda: 4/10/2025 Final action:
Title: Review/Approve Draft TPO Resolution 2025-03 Adopting Performance Targets for Pavement, Bridge, and System Performance for the Polk TPO
Attachments: 1. AI15_A1_Draft TPO Resolution 2025-03 Pavement & Bridge Performance
Date Action ByActionResultAction DetailsAgenda DetailsVideo
No records to display.

AGENDA ITEM

title

Review/Approve Draft TPO Resolution 2025-03 Adopting Performance Targets for Pavement, Bridge, and System Performance for the Polk TPO

body

 

PRESENTER

Ryan Kordek, Polk TPO

 

SUMMARY

Under Federal regulations, MPOs must set four-year targets for the six bridge and pavement condition measures and four-year targets for three system performance measures.  These are listed below as PM2 (Bridge and Pavement) and PM3 (System Performance.

Though an MPO has the option to establish its own system and infrastructure asset targets, the Polk TPO has agreed to support performance targets established by the Florida Department of Transportation (FDOT) for PM2 Pavement, Bridge and PM3 System Performance.

FDOT recently adjusted the 2025 targets for PM2: percentage of national highway system (NHS) bridges in poor condition; and PM3 percentage of person-miles traveled on the interstate and non-Interstate NHS that are considered reliable.  As a result, there is a need for the Polk TPO to also adjust our targets.  FDOT has also recommended the TPO to confirm its targets for the other PM2 and PM3 targets as well.  The TPO’s TAC recommends approval of the Draft Resolution.

 

RECOMMENDED ACTION

Recommend the TPO Board approve Draft TPO Resolution 2025-03

 

ATTACHMENT

1.  Draft TPO Resolution 2025-03