File #: 23-2412   
Type: Consent Agenda Status: Passed
File created: 5/5/2023 In control: Board of County Commissioners
On agenda: 6/6/2023 Final action: 6/6/2023
Title: Approve Consultant Services Authorization (CSA) No. 22-087-01 with HDR Engineering Inc., (Consultant) for engineering services for the design of improvements to the CR 54 (Ronald Reagan Parkway) at May Fair Boulevard Intersection. ($166,978.03 one-time expense)
Attachments: 1. CSA 22-087-01 CR54 @ Mayfair Blvd_Final Backup

SUBJECT

title

Approve Consultant Services Authorization (CSA) No. 22-087-01 with HDR Engineering Inc., (Consultant) for engineering services for the design of improvements to the CR 54 (Ronald Reagan Parkway) at May Fair Boulevard Intersection. ($166,978.03 one-time expense)

body

DESCRIPTION

This CSA will provide professional engineering services to perform roadway design, utility coordination, geotechnical investigation, subsurface utility engineering (SUE) and for construction plans for a new mast-arm traffic signal system which will include full pedestrian features and improve/reconstruct existing sidewalks and ADA ramps as required to accommodate crosswalks on all legs of CR 54 (Ronald Reagan Parkway) at May Fair Boulevard intersection.

The CR 54 (Ronald Reagan Parkway) at May Fair Boulevard Intersection Improvements Project is included in the FY 2022-2023 CIP for the Roads & Drainage Division. County staff has negotiated a CSA with the Consultant to provide professional engineering services for this Project. The Consultant is to perform these services at a total not-to-exceed fee of $166,978.03 and will be completed as detailed in “Exhibit A”.

RECOMMENDATION

Request the Board approve CSA No. 22-087-01 with the Consultant at not-to-exceed fee of $166,978.03 for the CR 54 (Ronald Reagan Parkway) at May Fair Boulevard Intersection Improvements Project.

FISCAL IMPACT

Funds are budgeted and available in the Transportation Millage Fund.

CONTACT INFORMATION

William G. Lorenzo, P.E.

Project Management

Roads & Drainage Division

(863) 535-2286

 

Jay M. Jarvis, P.E.

Roads & Drainage Division Director

(863) 535-2200